This project has made it possible to provide potable water to more than 2 million people. Many of them receive drinking water for the first time and others extend their supply schedule to 24 hours.
The work consists of the construction of a hydraulic water collection structure, located on the right shore of the Rimac river, and the edification of a water treatment plant in Huachipa. Additionally, a 27 km long channel was made, which includes 2 tunnels (5 km each) and 5 tanks with capacities of 2,000 and 9,000 m3.
NEVI Modular Formwork was used to build the walls, both single and double-sided. In fact, 8.20 m high walls were built with this system in the hydraulic water collection structure.