In regards to the technical characteristics, this construction project dealt with a significant volume of novel products such as the CC4 Aluminum Formwork, which was used for laying slab formwork. ALUPROP props were ideal for shoring the Horizontal CC4 Formwork because of the large loads to be supported and the heights at which other props were not adequate. In this manner, even double heights were covered in which double Bracing Prop was used, just as the system allowed. The result was a high level of finish and job performance.
Construction area access was obtained using the BRIO ladder, which totally hung from the perimetral screens.
Vertical ORMA Formwork was used in the construction of the basement wall, outer wall, machine room and the pillars.