In the new facilities, the concrete slab was cast with ENKOFLEX, made up of timber beams and three-layer boards, on BRIO Shoring System, which guaranteed the safe distribution of the various loads.
CLR system was used to build the circular columns, achieving a perfect fair-faced concrete finish. All of the column formwork was equipped with BRIO platforms for concrete pouring, allowing workers to perform tasks in a safe and fast manner.