Metro Line 2, São Paulo, Brazil
Effective response to the project's technical needs
This is the construction of a metro station in a tunnel, requiring and very short project turnaround time. It was necessary to come up with a method that would enable the construction of large scale side walls, leaving open only a center strip of 4.50 m to execute thereafter. It is considered the construction work with the largest cross section in Brazil.
weitere Details